The builders have been cracking on again and have got the house to a stage where one of the new first floor sections is in. Blockwork is nearly up to the roof on the front extension and stone is up to the first floor level.

The ashlar stone window cills are in in places and we also had a stone made with our house number on which has been put into the left side of the entrance porch.

Images are below of house the house is getting on. It's getting cold again so hope it doesn't disrupt things too much this week.

On the 21st January
And as it looks on 28th January

The right side extension with ashlar stone window cill

The front of the house with first floor put in and blockwork going up

The entrance porch with our house number

The house number itself

Inside the front extension. This part will become a section of the kitchen.

Our new front door will go here

The downstairs w.c. will go here

This will be the third bedroom and also have the master bedroom en--suite

Taken from where the en-suite will be, looking towards bedroom three