The ashlar stone window cills are in in places and we also had a stone made with our house number on which has been put into the left side of the entrance porch.
Images are below of house the house is getting on. It's getting cold again so hope it doesn't disrupt things too much this week.
On the 21st January |
And as it looks on 28th January |
The right side extension with ashlar stone window cill |
The front of the house with first floor put in and blockwork going up |
The entrance porch with our house number |
The house number itself |
Inside the front extension. This part will become a section of the kitchen. |
Our new front door will go here |
The downstairs w.c. will go here |
This will be the third bedroom and also have the master bedroom en--suite |
Taken from where the en-suite will be, looking towards bedroom three |