It's taken them longer than expected as all of the stone used was stripped off the original outside wall of the house and needed backing off and corners making, but now they can move back onto the right hand side extension which they have already started to do.
There is still about 3-4 weeks work for them, including the internal alterations still left to do.
I am in the process of getting some prices for electrics and plumbing at the moment.
The house is starting to look like a house |
The right side extension with walls going up on first floor |
The new gable end is coming together too |
The stone on the new rear extension. Best angle I can get at the moment. |
The kitchen has opened up by removing the wall |
How it used to look |
And how it looks now |
The master bedroom gets more block work |
The window to the front of the house |
No comments:
Post a Comment