We took delivery of the windows from Nu-Fit in Elland a few weeks ago and have fitted them in the last week or two along with the front door and frame and rear stable door and frame.
The windows are still to be siliconed in and we are awaiting the glass for the entrance, we have still to do the large window in the gable end...the glass weighs a ton so it needs some thinking about.
Pictures as the house look now are below. The door will be finished when it has stopped being banged and scraped by workmen.