Friday, 2 November 2012

Kitchen Arrives & Fitting Starts

The Kitchen arrived this week and the fitting began. Unfortunately some parts have been damaged in transit from Europe and lead time on these parts can be up to nine weeks. However we still have plenty to do elsewhere.

We used a company called Milligan & Jessop on Leeds Road in Huddersfield. Really good to work with and have been planning the kitchen for a while. Can't recommend them enough so far.

Pics below.





Tuesday, 30 October 2012

Kitchen ready for fitting

The kitchen is ready for fitting so we took all the appliances we have sourced over the past year up to the house over the weekend. The room has been given a few coats of white paint and downlights have gone in. So we are hoping it will look very different in here in the next few days.






Landing Skimmed & Almost Dry

Thelanding is skimmed and almost dried out. Plasterer Guru Simon from Honley does a top job!!



Wednesday, 24 October 2012

Landing Plasterboarded ready for Skimming

Some images of the landing after all the plasterboard was put in place. The skim has now been applied so more images when it's dry. We are also expecting the kitchen next week so plenty of action to come.





Wednesday, 26 September 2012

Fun & Games With Drains

While we have been getting the first fix plumbing and electrics done the builders have been getting the drain ditches dug and the pipes connected. It's been a hard job as a lot of the ground is rock at the left side of the house so the drains have to be quite shallow there and run deeper to the right of the house to allow the fall.

Building regs have checked it all and it just requires some crushed stone as back fill to protect the pipes as they are n a driveway.

When the builders went to connect up with the existing combined sewage and rainwater pipe they found it to be a 3 inch pipe and not the usual 4 inch. This goes through our small garden and into the neighbours stretching down to the road. We asked Yorkshire Water to check the pipe and they sent a contractor (DrainsAid) out to have a look. They told me there was a blockage just before the boundary with the neighbour and it was our responsibility to sort it out.

Consequently we had to call in our own drains company for them to tell me there was no blockage but there were tree roots 25-28 meters away. This was way off our property so Yorkshire water have again attanded to take a loook, I'm now expecting a visit in a week to look at getting rid of the tree roots...anything past our boundary is their responsibility.

We also contacted Yorkshire Water about re-newing the lead pipe that feeds the house but this would mean either digging up my neighbours garden as it follows the same line as the drains or getting a new connection down the access road to the property. Neither option is viable financially or practically so we have asked Yorkshire Water to test the water to make sure it is ok. We are expecting them today...at some point.


Tuesday, 25 September 2012

First Fix Plumbing and Electrics & Some Plastering

The first fix electrics have been done for a few weeks now, with the plumbing just about done so we took the opportunity to get some plasterboard up in the sections we could.

Took to ebay and got myself an auto screwdriver and a plasterboard lifter and set to work. On all the downstairs ceilings and any stud wall I have put in 100mm of earthwool type insulation to help deaden sound between rooms. I have also put soundblock plasterboard on the downstairs ceilings to stop noise/footsteps from upstairs.

The soundblock boards are much heavier than standard boards, about another 50% at 33kgs, but they are much denser and stronger than standard so hopefully they do actually block sound. We have also used the Soundblock board offcuts on areas that may get a lot of traffic and could be whacked and damaged as it is much stronger.

The plasterboard lifter has been worth its weight in gold. It meant we could lift the heavy boards onto flat ceilings but also onto the pitched ceilings upstairs too.

We have already had the kitchen skimmed by a local plasterer from Honley...The Plasterer Guru! Really good finish, took three days to do the kitchen and very impressed.

All we had to do then were cut holes for the downlights and speakers. Make sure you keep accurate measurements, or you might not get the holes right. We know from experience now!

Pics Below

The kitchen after being boarded and skimmed.

I cut the light holes with a downlight cutter and the speaker holes with a rotozip


Speaker and downlight holes

The boiler mounted on the wall under the stairs.

The living room with sound block plasterboard on the ceiling.

Living room again. We cut the hole in the floor here to get the big window upstairs.

The landing with celotex insulation and plasterboard up.

The en-suite waiting for concrete boards around the shower area. We cut the floor out for a shower tray so it can be tiled on top of.

Master Bedroom.

Office from the landing.

Monday, 24 September 2012

Big Window Goes In

It's been a while since I updated this but I took a few more pics this weekend.  couple of months ago we managed to get the large window in the gable end fitted. It meant cutting a hole in the floor and lifting it through from the ground to the first floor.

Wasn't sure how that would go but with six people (I called in a few mates) it was easy. Once we knew we could get the glass up from the inside we could fit the frame and then lift the glass into place.

Me and my Dad...as with all the windows...fixed in the frame and called a local friendly neighbour just to help lift the glass into the frame.

Looks pretty good, and the house is totally sealed with the exception of draft seals and stormguard on the front and back doors.

The gable end with large window eventually installed

The window up close. Still needs sealing and finishing round the edges.

The window and view from the inside of the bedroom.

Wednesday, 11 July 2012

Most Windows Fitted & External Doors Go In

We took delivery of the windows from Nu-Fit in Elland a few weeks ago and have fitted them in the last week or two along with the front door and frame and rear stable door and frame.

The windows are still to be siliconed in and we are awaiting the glass for the entrance, we have still to do the large window in the gable end...the glass weighs a ton so it needs some thinking about.

Pictures as the house look now are below. The door will be finished when it has stopped being banged and scraped by workmen.





Tuesday, 19 June 2012

Bifold Doors Fitted

We fitted some bi-fold doors over the weekend from a company called Vufold based in Macclesfield. We had a look at afew types of folding/sliding door and these seemed the best for the cash.

I fitted them with my Dad in a weekend. It could have taken a day but we had to chip some stone from the opening to get the frame in. The instructions were also a little misleading here and there but we eventually figured them out and completed the fitting. They look really good and they have a smooth action. Pictures below. The plastic protective film is still on the glass.




A Secret Cellar

The builders have dug out all the original stone slabs so we can concrete the floor and get it nice and level as it was a bit wibbly wobbly. As they pulled up a stone in the kitchen a cellar was revealed. It's only small but we had to think about if we could justify opening it up and using it. After a bit of thought we decided against it as we would compromise where we would be able to put the boiler, washing machine and dryer. We are going to have these under the stairs but if we opened up the old staircase to the cellar we would lose this space. Along with the extra cost of making it useable, it didn't seem worth it. I managed to point the camera in the cellar though and get a few pics.



Monday, 14 May 2012

Original ceiling ripped down on second floor

We took the decision to take all the original ceilings down on the second floor and keep the landing open, as there are a few nice looking beams we can expose. I'll be putting a ceiling back in the second bedroom though. It means a little more expense on insulation for pitched roofs but should be worth it.

Beams in bedroom 2 but there will be a new ceiling put in here

The landing with new window on staircase. These beams will be left exposed.

Landing beams again


The little hole you had to crawl through to access the loft before

Steel and stone goes in to finish off the top of the big bedroom window.